General Description
Equipped together with the zero leak bidirectional checking sole-noid valves, this power unit is built for your operation of two independent circuits. Which are respectively to the most important and subordinate platforms with the double scissors lift. Two cut-off valves are utilised for reducing the machine manually in situation of electrical power loss. If extra independent circuits are required for your application please contact us for availability.
Remark: 1. Please check with our income engineer for the various pump displacement, motor energy or tank capability.
2. CSA or UL certified motors are available on request.
Special Notes
1. The AC motor is of S3 duty cycle, which might only perform intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean the many hydraulic parts concerned in advance of set up of the electrical power unit.
three. Viscosity with the oil shoud be 15~46 cst,and also the oil really should be clean and cost-free of impurities,N46 hydraulic oil is proposed.
four. The electrical power unit really should be mounted vertically.
5. Check the oil degree inside the tank after the initial working from the power unit.
six. Oil changing is required just after the original a hundred operation hours,afterwards the moment each and every 3000 hrs.